Timber frame construction
HolzWerk³ timber frame construction
Timber frame construction - the flexible construction method for modern, sustainable building
Light, stable and energy-efficient - timber frame construction is the basis of our modular construction method.
As a proven form of construction, it combines high structural performance with a low dead weight - ideal for fast, precise and sustainable construction processes. At HolzWerk³, we rely on timber frame construction when Ecological responsibility, architectural freedom and short construction times are in demand.

TIMBER FRAME CONSTRUCTION FOR TRADE
What is timber frame construction?
The Timber frame construction is a construction method in which the load-bearing structure consists of a Sturdy wooden frame consists of. The gaps with High-quality insulation and planked on both sides with wood-based materials or gypsum fibreboards. This creates Highly thermally insulated wall, ceiling and roof elementswhich are prefabricated and precisely prepared in the factory. These prefabricated timber elements enable extremely fast and efficient assembly - ideal for a wide range of construction projects such as Tiny Living projects, detached houses or multi-storey residential buildings.
But the Timber frame construction shows its strengths particularly in the commercial sector: large hall buildings such as Industrial hallslogistics centres or retail properties benefit from the advantages of this construction method.

Timber frame construction of an industrial hall
Through Short construction timeshigh energy efficiency and sustainable materials is the Timber frame construction an attractive alternative to the conventional Commercial construction.
Especially with large-volume projects - In retail, warehouse logistics or production areas, for example, timber frame construction offers decisive advantages: Economic efficiency, Sustainability, fast realisation and architectural flexibility.
Whether Industrial hall made of timber, energy-efficient commercial property or sustainable hall construction - with timber frame construction, we create space for the future.
APPLICATION AREAS
Areas of application for timber frame construction
Timber frame construction is ideal for:
- Commercial property for trade, logistics and industry (e.g. supermarkets, logistics centres, production halls and warehouses)
- Modular residential buildings (Tiny houses, detached houses, terraced houses)
- Multi-storey timber buildings (e.g. residential complexes)
- Special building projects such as kindergartens, schools or event rooms
- Additions and extensions in stock
- Construction projects that can be realised quickly with high energy efficiency
Timber frame construction is particularly impressive in the commercial sector due to its short construction time, the high level of prefabrication and the possibility of realising sustainable buildings economically. Whether in large areas such as logistics and industrial halls or in city centre retail properties with challenging site conditions - the flexibility of timber frame construction creates clear advantages here.
Timber frame construction is also often the ideal solution for complex property situations, tight schedules or the desire for ecologically responsible construction.
PERFORMANCE
Expertise in timber frame construction - our services at a glance:
Timber frame construction is ideal for:
- High degree of prefabrication: Wall, ceiling and roof elements are produced in the factory with millimetre precision - for maximum quality and short assembly times.
- Precise manufacturing: CNC-controlled processes guarantee precisely fitting timber construction elements with minimal tolerances.
- Customised wall modules: We realise all standard wall thicknesses up to 24 cm and wall sizes up to 3.50 m x 12 m - with an annual production output of up to 30,000 m³.
- Cost-efficient construction: Compared to solid construction, timber frame construction offers significant savings potential - ideal for affordable housing and cost-effective commercial projects.
- Fast realisation: Thanks to optimised processes, we achieve delivery and assembly times of just 14 days from release of the drawing.
- Flexible use: Our timber construction elements are approved for all common building classes up to and including building class 5.
Whether multi-storey residential buildings, Industrial hall or Modular commercial construction - We supply you with the right Solution in the modern timber frame construction.